A pharmaceutical production equipment specialist built around GMP

SHINWONGPharmaceutical Manufacturing
ENVIRONMENT AND SAFETY

Environment, Safety and Health

Our environmental policy, energy and resource management, and safety and health targets and activities.

Environmental policy

We manage two things together: how we build the equipment, and the energy that equipment then uses in the customer’s plant.

  • Legal compliance is the floor, and our internal limits are set tighter than the law requires.
  • Cutting fluid and wash liquids from machining are recovered, and the treatment is recorded.
  • At the design stage we look at heat recovery and wash water reuse, which lowers the customer's running cost.
  • We prefer reusable packing, and waste segregation rules are posted at each site.

Environmental indicators

The basis of measurement and the unit are stated for each item.
Item202320242025
Electricity use1,860 MWh1,910 MWh1,840 MWh
Water use9,400 t9,650 t8,980 t
Waste generated214 t221 t198 t
Recycling rate71%74%79%
Greenhouse gas emissions1,120 tCO2eq1,140 tCO2eq1,060 tCO2eq

Safety and health policy

Assembly work involves heavy lifting, welding, work at height and access to moving parts during commissioning. Where a hazard cannot be removed we manage it with procedure and protective equipment, and we make sure the schedule allows the procedure to be followed.

TargetsZero serious incidents, and a rising number of near miss reports
Risk assessmentAn annual review, plus an assessment whenever a new process is introduced
TrainingInduction training, periodic training and training for specific hazardous tasks
ContractorsA pre task briefing on hazards and a permit to work procedure
InspectionDaily site checks, a monthly safety meeting and an annual internal audit

We were certified to ISO 45001 in 2023 and maintain that certification.

Safety activities

  • Near miss reports are received without penalty, and the person who reported gets an answer on what was done.
  • Commissioning areas are physically separated, and an isolation procedure applies before anyone reaches into a machine.
  • Heavy items are handled only with the designated jigs and cranes, and manual handling limits are posted.
  • When working on a customer site, that site's safety rules take precedence.
↑